The beginnings

The Group was born in the 80s in the treatment of waste water. Subsequently, the Novaen company was created in 2010 and started working with solar panels.

Balangero
Peak power: 995 kW
Incentive rate: IV Energy Bill
Entry into service: June 2011
Average production: 1,250 MWh/year

Leini 1
Peak power: 200 kW
Incentive rate: IV Energy Bill
Entry into operation: January 2012
Average production: 200 MWh/year

Leini 2
Peak power: 110kW
Incentive rate: IV Energy Bill
Entry into operation: February 2012
Average production: 110 MWh/year
Projects on agricultural areas

Pipelines in Sicily
Over 200 MW pipeline in Sicily. Connection on MT grid @20kV and HV grid @150 kV